Women and Children Centre, RIPAS hospital (Phase 1)

Summary Description

The Works are the Construction and Completion of the following: –

(a)  One block of nine (9) storey main women and children hospital building complete with two (2) levels of basements (approximately 36,200 m2)

(b)  The associated external works and services comprise the following: –

  1. Siteworks, turfing and landscaping
  2. Roads and carparks
  3. Stormwater drains and culverts
  4. Ancillary building
  5. External Water Supply
  6. Foul Drainage
  7. Children playground
  8. Signs and Lettering
  9. Covered walkways and OT link bridge
  10. Mechanical and Electrical Installations

 

Generally the buildings have a reinforced concrete contiguous bored piles external walls to basements, reinforced concrete and steel frame on reinforced concrete bored piles with steel roof sheeting on metal trusses and reinforced concrete roof slabs, reinforced concrete and brick internal and external walls, timber and aluminium internal doors, aluminium windows,curtain walls, louvres and partitions;  vinyl flooring, carpet, tiles or cement and sand screed floor finishes; aluminium composite panels, tiles or plaster and paint wall finishes; metal, mineral fibre board or plaster and paint ceiling finishes.

Project Details

Women and Children Centre, RIPAS hospital (Phase 1) – J137R

Client The Honourable Minister of Development, Negara Brunei Darussalam
Duration Thirty (30) months
Date of Commencement 07 April 2011
Date of Completion 30 September 2014
Our Services Quantity Surveying

 

Our Works

Similar Projects